Mount Hermon Bridge Zayante Creek, Felton, CA Click on any image to go back to the Mt Hermon Specification Page Construction Images 2006
|
||
The old bridge before demolition.
|
The old bridge displaced by tree.
|
|
The old mainline enveloped by tree.
|
A tower from the old bridge.
|
|
Aaron Nelson up on the tower.
|
The second mainline gets pulled across.
|
|
Suspenders make their way out.
|
A suspender hanging over Bean Creek.
|
|
Carroll Vogel installs suspenders.
|
Floorbeams are installed.
|
|
Aaron preps more floorbeams for installation.
|
Aaron installs floorbeams.
|
|
The team cuts the floor boards on site.
|
Morning light cuts through the redwoods.
|
|
Rebecca Willms and Aaron drill out the decking.
|
Marty installs the water lines.
|
|
Aaron installs the decking.
|
Decking going out from below.
|
|
Carroll and Dale Pollock on bridge.
|
||
The team: Aaron, Marty, Dale, Rebecca and Carroll.
|
||
The bridge as decking was being installed.
|
||
A view of the finished bridge. |
||